If you are looking for high-quality products, please feel free to contact us and send an inquiry, email: brad@ihpa.net
Russia and Ukraine is an important exporters of oil, natural gas, metals, fertilizers, rare gases and other industrial raw materials. Affected by the further intensification of the tension of the war, the global market has become more worried about the supply of the Foam Generator, and panic spreads in the futures market. Prices of commodities such as aluminum and nickel are at recent highs on concerns that supplies will fall. Russia accounts for 49 percent of global exports of nickel, 42 percent of palladium, 26 percent of aluminum and 13 percent of platinum, and is a significant exporter of steel and copper. Palladium is an important metal for sensors and memory. In addition, Russia is the world's largest exporter of nitrogen fertilizer, the second largest exporter of potash fertilizer, and the third-largest exporter of phosphate fertilizer. Ukraine is also an important producer of nitrogen fertilizer. Russia's natural gas supply also has a significant impact on the global fertilizer industry and Foam Generator industry, especially in Europe. The price of the Foam Generator will also fluctuate to some extent. Russia carries out crude gas separation, and Ukraine is responsible for refined exports. Ukraine supplies 70% of the world's neon, 40% of krypton and 30% of xenon. These three gases are the materials used to make chips.
Performance parameters:
The 3kW foaming machine is a small cement foam generator. It is a special equipment specially used for producing foam in small factories. It is simple and convenient to operate. It is suitable for small factories, universities, colleges, scientific research institutes and other production departments to develop new products. It can also be used for medium-sized construction in decoration projects.
Usage and installation method:
Power connection: This equipment uses a three-phase 220V power supply. After all the lines are connected, click the start button, and then immediately click the stop button to check the direction of rotation. Make sure that the direction of rotation of the motor is correct. If the direction of rotation of the motor is incorrect, The two live wires need to be exchanged arbitrarily, and don't connect them wrongly.
Note: The panel voltmeter will display after the wiring is completed and the power is turned on. When the display voltage is normal at 220V, the air switch can be closed at this time, and the device enters the operational state.
Pipeline connection: Please connect the water pipe and foaming agent straw to the corresponding interface at the front of the device. use Wrap the tape around the joint to prevent air leakage. If air leakage occurs, the foaming agent cannot be pumped or
Insufficient flow affects the efficiency of bubble making.
Bubble tube: The bubble tube is external and detachable. The front end of the bubble tube is detachable to replace the steel ball filled in the tube. The operation is simple, convenient and quick when disassembling.
Usually need to be disassembled:
1. After working for a long time, it is found that the foam shape is not good, usually more than three months.
2. Pipe blockage: Some foaming agent remaining in the bubble tube will form a solid residue. In this case, the foam cannot be produced normally, or the pipeline pressure increases sharply. At this time, all the old steel balls need to be taken out, and then replaced with a new one The ball is fine. Steel wire ball specification requirements: each blowing tube needs to be filled with about 12-15 steel wire balls. Too much or too little will affect or even destroy the foam performance.
Precautions:
1. Remember to use electricity safely. If water or foam touches the circuit, you must immediately cut off the power at the remote end to ensure safe production.
2. There will be air in the pipeline when it is used for the first time. The foaming liquid has not been pumped into the equipment in a short time. You can wait for tens of seconds until the liquid is filled with the entire suction tube and the foaming operation can be performed normally.
3. Do not start the equipment when the pipeline is blocked to prevent damage to the components due to overpressure in the pipeline.
COVID-19 has led to many sites shutting down. What is the impact on China's foreign trade enterprises as a whole and small, medium and micro foreign trade enterprises?
. It is learned that some foreign trade enterprises have been affected by the epidemic and are facing periodic problems in Foam Generator operated by foreign trade enterprises will also fluctuate with the changes of the epidemic. Contact us for the latest quotation on Foam Generator.
Inquiry us
In 2023, the China Greater Bay Area Concrete Industry High-Quality Development Seminar and the Expo on Concrete Equipment and Technology will take place at the Guangzhou Canton Fair Complex. Guangzhou Canton Fair Complex. The conference's theme will…
It is very easy to cause concrete cracking if the construction or maintenance are not done correctly. What are then the five main causes of cracking concrete? 1. The cement problem: Some workers in construction will add more water for a more fluid co…
Boron carburide is a high-performance carbon compound, which is composed primarily of boron, carbon, and other elements. The chemical formula for B4C is B4C. It is widely used by industries, the military, aerospace and other fields because of its cha…